Milavec Delivery Improvement

About the Project

The Town of Frederick completed the Lower Boulder Water change case in 2025. As a requirement of that process the Town must be able to deliver return flows to local streams and ditches to offset potential impacts of using the waters rights in an irrigation system instead of on the historic farm. The first improvement will involve extending a waterline from the existing raw water system to a concrete pipe that runs from the Fox Run neighborhood to the Godding Hollow.

Project Facts

  • Total Budget: $425,000
  • Total Construction Cost: TBD
  • Location: First improvement is located west of Milavec Lake, south of the Fox Run Neighborhood.

Project Timeline/Important Dates

  • Design completed in Q4 of 2025.
  • Agreement for Lower Boulder lateral crossing is required. Conversations have begun with the Ditch Company regarding this agreement.
  • To be constructed in Q4 2026.

Project Benefits

  •  This project allows the Town to convert Lower Boulder shares from irrigation use to municipal use which allows the Town to treat those shares for drinking water in the future. 
  • The project increases our future potable water supply.
  • This project adds flexibility to the Town for operations to meet return flow obligations. 

Contact Us

Communications are managed by the Town of Frederick
Project Manager: Sarah Watson
Project Hotline: 720-382-5603
Project Email: swatson@frederickco.gov

Traffic Impacts 

None

FAQS

When would this be built?
Construction of the project will begin in Q4 of 2025. 

How would this project be funded?
This project will be funded by the Water Fund. The new water rate increase allows the Town to complete necessary infrastructure.